Six to eight weeks is comfortable for most Austin events. Our presses ship as freight from the Fullerton shop and the crew flies in, so the freight schedule sets the pace. If your date is sooner, ask anyway.
A simple timeline
- 8+ weeks out: ideal for SXSW activations and ACL weekends, when crews, hotels and freight all get tight. There's room for art proofing, garment sourcing and station planning.
- 6 to 8 weeks out: the comfortable window for most Austin events. Send the date, venue and headcount and we lock the setup and the freight.
- Under 6 weeks: often still doable with simple art and standard blanks. Ask and we'll tell you fast.
What speeds things up
Have the logo or artwork ready, plus a rough headcount, the venue and date, and which stations you want. The sooner we have all of it, the sooner art gets proofed and the freight gets booked. Final art about a week out keeps the blank order on time.
Short notice? Don’t assume it's too late. Simple art and standard blanks are what make a fast Austin turnaround possible, so send the date and we'll give you a straight answer.
Next: the lead-time answer, pricing, or your Austin quote.
Austin planning
What gets planned before the freight ships
Austin is a fly-out for us, so the station is planned on paper before anything leaves the Fullerton shop. We map the load-in, the power, where the line forms and where guests pick a size before they reach the press. At the Austin Convention Center that plan includes the marshalling window and the electrical order. On a Rainey Street patio or in an East Austin warehouse it's mostly shade, a level floor and the queue.
The kit doesn't change: presses, flash dryers, heat presses, blanks, folding tables, signage and trained printers. It ships as freight and the crew flies in. A standard station needs about 10×10 ft and two 120V circuits, and a two-press setup clears 100+ shirts an hour when the design menu is simple.